Blog, Project Hayle Railway Bridge Posted on September 23, 2015February 5, 2018 by Duncan Ridge 23 Sep The Lime pointing work continues on Hayle Bridge for me and the guys.. Here I am hard at work..Well for 30 seconds..Normally I do the full 8 hours Restoration of Hayle Railway Bridge Grade 2 Listed Period Restoration St Buryan